DocumentCode
1053215
Title
Design studies for the Mead-Phoenix 500 kV AC transmission project
Author
Thallam, R.S. ; Lundquist, T.G. ; Gerlach, D.W. ; Atmuri, S.R. ; Selin, D.A.
Author_Institution
Salt River Project, Phoenix, AZ, USA
Volume
10
Issue
4
fYear
1995
fDate
10/1/1995 12:00:00 AM
Firstpage
1862
Lastpage
1874
Abstract
The Mead-Phoenix 500 kV AC transmission line (USA) is 243 miles long and runs parallel to the existing Mead-Liberty 345 kV line. This line is planned for 70% series and 70% shunt compensation: it also incorporates the first application of a 500 kV phase shifting transformer that enables 1300 MW transmission capacity. This paper presents the design studies that were undertaken in arriving at the equipment ratings and insulation levels that lead to the equipment specifications. The shunt reactor switching requirements utilizing metal-oxide varistors across the breaker, line switching with line connected arresters and the breaker transient recovery voltage are also dealt with in the paper
Keywords
arresters; circuit breakers; compensation; design engineering; power system protection; power transformers; power transmission lines; project engineering; reactive power; transmission networks; 1300 MW; 243 mile; 345 kV; 500 kV; AC transmission line; USA; VAr compensation; circuit breaker transient recovery voltage; design studies; equipment rating; equipment specifications; insulation level; line connected arresters; line switching; metal-oxide varistors; phase shifting transformer; project; series compensation; shunt compensation; shunt reactor switching; transmission capacity; Arresters; Conductors; Inductors; Power system transients; Power transformer insulation; Rivers; Samarium; Shunt (electrical); Substations; Transient analysis;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.473369
Filename
473369
Link To Document