DocumentCode :
1056038
Title :
Field Experience with Fiber-Optic Cable Installation, Splicing, Reliability, and Maintenance
Author :
Szentesi, Otto I.
Author_Institution :
Siecor Corp., Hickory, NC
Volume :
1
Issue :
3
fYear :
1983
fDate :
4/1/1983 12:00:00 AM
Firstpage :
541
Lastpage :
546
Abstract :
The experience obtained during the installation of more than 700 sheath km of fiber-optic cable is summarized. These include in-building, underground (duct), aerial, buried, and underwater installations. In general, no special precautions are required except to maintain the specified pull tension and cable bend radius. Field splicing is discussed and results are given on splice losses with and without splice loss monitoring with the optical time domain reflectometer. A 28 percent learning curve for fusion splicing is derived. Reliability data on 312 sheath km of installed cable and field splices are presented. Most of the cable failures were in the "uncontrollable extrinsic category," and most of these were due to complete cable cuts. Finally, restoration is reviewed with emphasis on troubleshooting, repair, emergency restoration, and offset breaks.
Keywords :
Communication system maintenance; Communication system reliability; Optical fiber cables; Optical fiber connecting; Application software; Cable shielding; Coaxial cables; Communication cables; Ducts; Maintenance; Optical fiber cables; Optical losses; Splicing; Underwater cables;
fLanguage :
English
Journal_Title :
Selected Areas in Communications, IEEE Journal on
Publisher :
ieee
ISSN :
0733-8716
Type :
jour
DOI :
10.1109/JSAC.1983.1145960
Filename :
1145960
Link To Document :
بازگشت