Title :
A Multiagent-Based Decision-Making System for Semiconductor Wafer Fabrication With Hard Temporal Constraints
Author :
Yoon, Hyun Joong ; Shen, Weiming
Abstract :
This paper presents a decision-making system for semiconductor wafer fabrication facilities, or wafer fabs, with hard interoperation temporal constraints. The decision-making system is developed based on a multiagent architecture that is composed of scheduling agents, workcell agents, machine agents, and product agents. The decision-making problem is to allocate lots into each workcell to satisfy both logical and temporal constraints. A dynamic planning-based approach is adopted for the decision-making mechanism so that the dynamic behaviors of the wafer fab such as aperiodic lot arrivals and reconfiguration can be taken into consideration. The scheduling agents compute quasi-optimal schedules through a bidding mechanism with the workcell agents. The proposed decision-making mechanism uses a concept of temporal constraint sets to obtain a feasible schedule in polynomial steps. The computational complexity of the decision-making mechanism is proven to be, where is the number of operations of a lot and is the cardinality of the temporal constraint set.
Keywords :
decision making; decision support systems; multi-agent systems; scheduling; semiconductor device manufacture; bidding mechanism; dynamic planning; hard temporal constraints; machine agent scheduling; multiagent-based decision-making system; product agents scheduling; semiconductor wafer fabrication; workcell agent scheduling; Computational complexity; Decision making; Delay effects; Fabrication; Furnaces; Job shop scheduling; Manufacturing; Polynomials; Processor scheduling; Real time systems; Decision-making systems; hard temporal constraints; multiagent systems; scheduling; semiconductor manufacturing;
Journal_Title :
Semiconductor Manufacturing, IEEE Transactions on
DOI :
10.1109/TSM.2007.914388