• DocumentCode
    1065316
  • Title

    Modulator charging system upgrade for a 5-MeV electron acceleration

  • Author

    Rogers, Doyly, Jr. ; Dexter, W. ; Myers, A. ; Reginato, Louis L. ; Zimmerman, A.

  • Author_Institution
    Lawrence Livermore Laboratory, Livermore, CA
  • Volume
    26
  • Issue
    10
  • fYear
    1979
  • fDate
    10/1/1979 12:00:00 AM
  • Firstpage
    1509
  • Lastpage
    1511
  • Abstract
    The Lawrence Livermore Laboratory is currently constructing a new linear induction accelerator with a higher beam current than the Astron [1] accelerator. The new accelerator, called the Experimental Test Accelerator (ETA) will be a 5-MeV, 10-kA accelerator with a pulsewidth of 50 ns. Like the Astron, the principle of magnetic induction is used to obtain a linear accelerator. The modular accelerating cavities form essentially a 1:1 transformer and the change in flux in the ferrite core induces an axial electric field for the acceleration of electrons. Since the total energy storage for the ETA is much greater than the requirement for Astron, the power system, the capacitor bank, and the modulator charging system all had to be modified to provide an overall regulation of 0.1 percent. This strict regulation of the charging voltage is necessary for pulse-to-pulse repeatability.
  • Keywords
    Acceleration; Electrons; Laboratories; Life estimation; Linear accelerators; Particle beams; Pulse power systems; Pulse transformers; Testing; Time of arrival estimation;
  • fLanguage
    English
  • Journal_Title
    Electron Devices, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9383
  • Type

    jour

  • DOI
    10.1109/T-ED.1979.19639
  • Filename
    1480217