    Optimization Study on Voltage Level and Transmission Capacity

  • Author

    Jinhua, Zhang

  • Author_Institution
    Dept. of Power Syst., China Electr. Power Res. Inst., Beijing
  • Volume
    24
  • Issue
    1
  • fYear
    2009
  • Firstpage
    193
  • Lastpage
    197
  • Abstract
    Jinsha river has very abundant hydro power reservation, ranking first in all the hydro power bases of China. To deliver the 38-GW hydro power from Jinsha power stations by HVDC transmission lines to load centers 1000-2000 km away, it is necessary to determine the right voltage level and the capacity of each bipole. This paper proposes three preliminary power delivery scheme and presents an optimization method for transmission capacity, dc voltage and conductor size. Based on a comprehensive comparison of cost-effectiveness, technical feasibility and network security and stability, it was recommended that the 3 bipolar plusmn 800-kV ultra HVDC (UHVDC) links with rated capacity of 6.4 GW for each link be adopted as transmission scheme of phase I hydro power station on Jinsha River.
  • Keywords
    HVDC power transmission; hydroelectric power stations; optimisation; China; HVDC transmission lines; Jinsha power stations; Jinsha river; hydro power reservation; optimization; power 38 GW; power delivery scheme; transmission capacity; ultra HVDC links; voltage level; HVDC transmission; optimization method; power system stability; power transmission economics; voltage;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2008.2008609
  • Filename
    4749366