Title :
Optimization Study on Voltage Level and Transmission Capacity
Author_Institution :
Dept. of Power Syst., China Electr. Power Res. Inst., Beijing
Abstract :
Jinsha river has very abundant hydro power reservation, ranking first in all the hydro power bases of China. To deliver the 38-GW hydro power from Jinsha power stations by HVDC transmission lines to load centers 1000-2000 km away, it is necessary to determine the right voltage level and the capacity of each bipole. This paper proposes three preliminary power delivery scheme and presents an optimization method for transmission capacity, dc voltage and conductor size. Based on a comprehensive comparison of cost-effectiveness, technical feasibility and network security and stability, it was recommended that the 3 bipolar plusmn 800-kV ultra HVDC (UHVDC) links with rated capacity of 6.4 GW for each link be adopted as transmission scheme of phase I hydro power station on Jinsha River.
Keywords :
HVDC power transmission; hydroelectric power stations; optimisation; China; HVDC transmission lines; Jinsha power stations; Jinsha river; hydro power reservation; optimization; power 38 GW; power delivery scheme; transmission capacity; ultra HVDC links; voltage level; HVDC transmission; optimization method; power system stability; power transmission economics; voltage;
Journal_Title :
Power Systems, IEEE Transactions on
DOI :
10.1109/TPWRS.2008.2008609