DocumentCode :
1075659
Title :
Electricity supplies for Addu Atoll
Author :
Brown, J. ; Maylin, R.F.
Volume :
3
Issue :
1
fYear :
1989
fDate :
1/1/1989 12:00:00 AM
Firstpage :
17
Lastpage :
26
Abstract :
The authors assess the rehabilitation requirements of power plant and power supplies for the public electricity undertakings of the Maldives Electricity Board in Male, the capital of the Republic of Maldives, and in particular Addu Atoll. The Maldives Electricity Board (MEB) is a Government owned organisation established in 1982. It is the statutory body responsible for public electricity supplies throughout the Republic of Maldives and responsible to the office of the President. The MEB systems operate at a frequency of 50 Hz and the voltages in use are 11 kV, 3.3 kV and 0.4 kV
Keywords :
electricity supply industry; 0.4 kV; 11 kV; 3.3 kV; 50 Hz; Addu Atoll; MEB; Maldives; electricity supply industry; power plant; power supplies; public electricity supplies;
fLanguage :
English
Journal_Title :
Power Engineering Journal
Publisher :
iet
ISSN :
0950-3366
Type :
jour
Filename :
28137
Link To Document :
بازگشت