• DocumentCode
    1078981
  • Title

    A Survey of Methods for Planning and Analyzing Accelerated Tests

  • Author

    Nelson, Wayne

  • Author_Institution
    Research and Development Center, General Electric Company, Schenectady, N. Y. 12301
  • Issue
    1
  • fYear
    1974
  • fDate
    3/1/1974 12:00:00 AM
  • Firstpage
    12
  • Lastpage
    18
  • Abstract
    This paper surveys methods for planning and analyzing accelerated life tests. Many of these methods are new and providemore informative results for less time and cost than do previous methods. These methods are of value to all who plan and analyze accelerated tests on any product or material.
  • Keywords
    Acceleration; Costs; Data analysis; Failure analysis; Information analysis; Life estimation; Life testing; Materials testing; Statistical analysis; Stress;
  • fLanguage
    English
  • Journal_Title
    Electrical Insulation, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9367
  • Type

    jour

  • DOI
    10.1109/TEI.1974.299289
  • Filename
    4081797