• DocumentCode
    1080376
  • Title

    Maximizing Power-System Loadability in the Presence of Multiple Binding Complementarity Constraints

  • Author

    Karystianos, Michael E. ; Maratos, Nicholas G. ; Vournas, Costas D.

  • Author_Institution
    Public Power Corp., Athens
  • Volume
    54
  • Issue
    8
  • fYear
    2007
  • Firstpage
    1775
  • Lastpage
    1787
  • Abstract
    In this paper, the problem of maximizing power-system loadability with multiple complementarity constraints representing generator limits is examined. The structure of the loadability surface is investigated, the various type of limits are classified and a general algorithm to optimize settings of control variables, in order to maximize loadability margin is developed. The importance of nonsmooth corner points (CPs) of the loadability surface that are due to the simultaneous occurrence of several loadability conditions is discussed. At such limits, maximization of loadability margin is performed based on techniques provided by nonlinear optimization theory. For this purpose an algorithm to identify multiple binding constraints on a CP is developed. Illustrative examples on small, but realistic systems are included.
  • Keywords
    load dispatching; optimisation; power system stability; generator limits; loadability margin; loadability surface; multiple binding complementarity constraints; nonlinear optimization theory; power-system loadability; Bifurcation; Jacobian matrices; Power engineering computing; Power generation; Power system restoration; Power system security; Power system stability; Power systems; Reactive power; Voltage; Complementarity constraints; corner point (CP); loadability limit; loadability surface; optimization;
  • fLanguage
    English
  • Journal_Title
    Circuits and Systems I: Regular Papers, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1549-8328
  • Type

    jour

  • DOI
    10.1109/TCSI.2007.902529
  • Filename
    4282079