The development of the complete X-factor contribution measurement for improving cycle time and cycle time variability
Author :
Delp, Deana ; Si, Jennie ; Fowler, John W.
Author_Institution :
Dept. of Electr. Eng., Arizona State Univ., Tempe, AZ
Volume :
19
Issue :
3
fYear :
2006
Firstpage :
352
Lastpage :
362
Abstract :
Reducing variability in a manufacturing process lowers system cycle times. Semiconductor manufacturing is a variable process due in part to product mix, reentry lot flows, batching, and machine breakdowns. This paper examines the issue of identifying machines that introduce variability into the system and constrain the system capacity. We develop a new X-factor contribution measurement, the complete X factor, that considers processing time variability and lot arrival variability among the constraining qualities of the machine groups. This new measure uses machine level data to indicate the normalized system cycle time which has typically been estimated by the ratio of the entire process time and the raw processing time at the end of production. With this measure it becomes possible for factory floor managers to identify a capacity constraining machine and its impact on the overall cycle time directly. We first qualitatively present the justification of the complete X factor for representing the normalized cycle time using queuing theory. Then, the complete X-factor measure was tested on a full-scale simulation model to demonstrate its accuracy for detecting capacity constraining machine groups and for representing normalized cycle time. We also explore the propagation of variability and the effect a highly variable machine group has on product cycle time and cycle time variability in relation to process routing. In a full-scale model machines identified by the complete X-factor contribution measure (CXC) measure lowered cycle time as effectively as highly utilized machines by adding capacity or streamlining breakdowns but had a more prominent effect on lowering cycle time variability. After a brief study on the propagation of variability, the CXC measure identified a lower utilized backend process that reduced cycle time and cycle time variability of the system
Keywords :
capacity planning (manufacturing); machine tools; manufacturing processes; queueing theory; semiconductor device manufacture; capacity analysis; capacity constraining machine; complete X factor; cycle time variability; full-scale simulation model; lot arrival variability; machine groups; manufacturing process; process routing; processing time variability; queuing theory; semiconductor manufacturing; variability reduction; x-factor contribution measurement; Electric breakdown; Manufacturing processes; Production facilities; Production systems; Queueing analysis; Routing; Semiconductor device breakdown; Semiconductor device manufacture; Testing; Time measurement; Capacity analysis; X-factor; cycle time variability;
fLanguage :
English
Journal_Title :
Semiconductor Manufacturing, IEEE Transactions on
Publisher :
ieee
ISSN :
0894-6507
Type :
jour
DOI :
10.1109/TSM.2006.879408
Filename :
1668234
Link To Document :
بازگشت