DocumentCode :
1083736
Title :
On How Often the Supervisor Should Sample
Author :
Sheridan, Thomas B.
Author_Institution :
Department of Mechanical Engineering, Massachusetts Institute of Technology, Cambridge, Mass. 02139
Volume :
6
Issue :
2
fYear :
1970
fDate :
4/1/1970 12:00:00 AM
Firstpage :
140
Lastpage :
145
Abstract :
A procedure is presented for specifying how long a supervisor or monitor of a process should wait between input samples to maximize a given value or payoff function, assuming he resets the controls with each sample as a function of the best information he has. The procedure is based upon Bayesian preposterior information analysis.
Keywords :
Automation; Constraint optimization; Control systems; Error correction codes; Information theory; Job shop scheduling; Linear programming; Operations research; Power generation; Redundancy;
fLanguage :
English
Journal_Title :
Systems Science and Cybernetics, IEEE Transactions on
Publisher :
ieee
ISSN :
0536-1567
Type :
jour
DOI :
10.1109/TSSC.1970.300289
Filename :
4082306
Link To Document :
بازگشت