• DocumentCode
    1086004
  • Title

    Control of processes with time delays

  • Author

    Schneider, Donna M.

  • Author_Institution
    Aluminum Co. of America, Alcoa Center, PA, USA
  • Volume
    24
  • Issue
    2
  • fYear
    1988
  • Firstpage
    186
  • Lastpage
    191
  • Abstract
    The need to control processes with time delays can be found in many aspects of the metallurgical industry from refining to rolling mills. When the time delay becomes long compared with the system time constant, or when the time delay varies, then control of the process becomes difficult using classical control methods. Three controllers are evaluated for their applicability to this problem: the classic proportional-integral (P-I) controller; the Smith linear predictor; and the Clarke-Gawthrop self-tuning controller. Each of the controllers is implemented on an example process which is first-order with a long time delay. All three control strategies are evaluated for their response to step reference changes, step load disturbances, and variations in the process time delay. No one control strategy has the perfect solution, so the advantages and limitations of each strategy are presented and discussed
  • Keywords
    adaptive control; controllers; delays; metallurgical industries; process control; two-term control; Clarke-Gawthrop self-tuning controller; Smith linear predictor; control strategies; control theory; controllers; metallurgical industry; process control; proportional-integral controller; refining; rolling mills; step load disturbances; step reference changes; system time constant; time delays; Control systems; Delay effects; Electrical equipment industry; Industrial control; Metals industry; Milling machines; Pi control; Process control; Proportional control; Refining;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/28.2854
  • Filename
    2854