• DocumentCode
    1086591
  • Title

    Level 6: why we can´t get there from here

  • Volume
    13
  • Issue
    1
  • fYear
    1996
  • fDate
    1/1/1996 12:00:00 AM
  • Firstpage
    97
  • Abstract
    The author considers how a project management method he calls evolutionary delivery is still missing from process improvement models. This method delivers long-term requirements, qualities, performance, and functionality in small, frequent, and early increments. He discusses how evolutionary delivery should certainly be one aspect of CMM level 6
  • Keywords
    project management; software development management; software quality; CMM level 6; evolutionary delivery; functionality; long-term requirements; process improvement models; project management method; software performance; software quality; Books; Computer architecture; Coordinate measuring machines; Design engineering; Humans; Milling machines; Software development management; Software engineering; System analysis and design; System testing;
  • fLanguage
    English
  • Journal_Title
    Software, IEEE
  • Publisher
    ieee
  • ISSN
    0740-7459
  • Type

    jour

  • DOI
    10.1109/52.476291
  • Filename
    476291