Title :
Reliability Reduction in Electrical Installations Due to Equipment Overload
Author :
Brandão, Augusto Ferreira, Jr.
Author_Institution :
Dept. of Electr. Energy & Autom. Eng., Univ. of Sao Paulo, Sao Paulo
Volume :
6
Issue :
1
fYear :
2008
fDate :
3/1/2008 12:00:00 AM
Firstpage :
74
Lastpage :
80
Abstract :
Markov chains are used in the reliability modeling of substation diagrams. In the adopted approach three states are assigned to the equipment operating conditions, corresponding to the normal, overload and repair states. Models are built including emergencies up to the second order. The overload influence on component failure rate and on substation reliability indices is examined. The components studied with more detail are the power transformer and the cables insulated with extruded material. The solution is achieved by the minimal tie-and-cut-set method and equations are developed for contingencies up to second order. Finally, an example is presented of a distribution substation and two load cycles.
Keywords :
Markov processes; installation; load management; power cables; power system reliability; power system simulation; power transformers; substations; Markov chains; electrical installations; equipment overload; power transformer; reliability modeling; reliability reduction; substation diagrams; Automation; Impedance; Power engineering and energy; Markov processes; insulated cable reliability; power transformer reliability; reliability modeling; substation reliability;
fLanguage :
English
Journal_Title :
Latin America Transactions, IEEE (Revista IEEE America Latina)
Publisher :
ieee
ISSN :
1548-0992
Type :
jour
DOI :
10.1109/TLA.2008.4461635
Filename :
4461635
Link To Document :
بازگشت