DocumentCode
1090715
Title
Accelerated protection of distribution systems with tapped off loads
Author
Bo, Z.Q. ; Dong, X.Z. ; Caunce, B.R.J.
Author_Institution
Energy Autom. & Inf., AREVA T&D Ltd., Stafford, UK
Volume
151
Issue
4
fYear
2004
fDate
7/11/2004 12:00:00 AM
Firstpage
461
Lastpage
468
Abstract
The paper presents a technique for accelerated protection of distribution systems with tapped off loads. In the technique, the sequence and superimposed signals are used to determine the remote circuit breaker operation, from which a decision on whether a fault is inside the protected section can be made. Extensive simulation studies with respect to a typical ring main system with tapped off loads show that the proposed technique is able to significantly increase the speed of response of the conventional time-grading-based protection scheme.
Keywords
circuit breakers; power distribution faults; power distribution protection; power system simulation; accelerated protection; circuit breaker operation; distribution systems; faults; ring main distribution system; sequence signals; superimposed signals; tapped off loads;
fLanguage
English
Journal_Title
Generation, Transmission and Distribution, IEE Proceedings-
Publisher
iet
ISSN
1350-2360
Type
jour
DOI
10.1049/ip-gtd:20040696
Filename
1331009
Link To Document