Transition From Construction to Operation Phase of the Wendelstein 7-X Stellarator
Author :
Bosch, Hans-Stephan ; Brakel, R. ; Gasparotto, M. ; Grote, Heinz ; Hartmann, D.A. ; Herrmann, Ralf ; Nagel, Michael ; Naujoks, D. ; Otte, Michael ; Risse, K. ; Rummel, T. ; Werner, Axel
Author_Institution :
Max-Planck-Inst. for Plasma Phys., EURATOM Assoc., Greifswald, Germany
Volume :
42
Issue :
3
fYear :
2014
fDate :
Mar-14
Firstpage :
432
Lastpage :
438
Abstract :
Assembly of the superconducting stellarator Wendelstein 7-X is well advanced, and commissioning of the device is being prepared. A first draft of the commissioning tasks has been developed and will be discussed in this paper.
Keywords :
stellarators; Wendelstein 7-X stellarator; commissioning tasks; construction phase; operation phase; superconducting stellarator; Assembly; Coils; Helium; Integrated circuits; Magnetic separation; Plasmas; Toroidal magnetic fields; Commissioning; Wendelstein 7-X; operation;
fLanguage :
English
Journal_Title :
Plasma Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0093-3813
Type :
jour
DOI :
10.1109/TPS.2014.2304012
Filename :
6746151
Link To Document :
بازگشت