• DocumentCode
    1099701
  • Title

    Scheduling theory and practice: Minsk group results

  • Author

    Sotskov, Yu.N. ; Tanaev, V.S.

  • Author_Institution
    Inst. of Eng. Cybern., Acad. of Sci., Minsk, Byelorussia
  • Volume
    3
  • Issue
    1
  • fYear
    1994
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    The paper surveys scheduling theory results obtained mainly at the Institute of Engineering Cybernetics of the Academy of Sciences of Belarus, and published on the whole in Russian. The survey deals with the job-shop, flow-shop and open-shop scheduling problems, and with sequencing jobs on one machine and on a set of parallel machines. The more complicated problems and applied aspects of scheduling theory are also observed. Some trends of further research in scheduling and sequencing are outlined
  • Keywords
    operations research; production control; Minsk group results; flow shop scheduling; job sequencing; job shop scheduling; open shop scheduling; parallel machines; production control; scheduling theory;
  • fLanguage
    English
  • Journal_Title
    Intelligent Systems Engineering
  • Publisher
    iet
  • ISSN
    0963-9640
  • Type

    jour

  • Filename
    291675