Title :
Construction Aspects of the Pinard-Hanmer 500-Kv Transmission Line
Author :
Mackie, G.A. ; Lemire, W.A.R.
Author_Institution :
The Hydro-Electric Power Commission of Ontario, Toronto, Ont., Canada.
fDate :
3/1/1964 12:00:00 AM
Abstract :
This paper describes construction aspects of the northern 228 miles of Ontario Hydro´s new 437-mile 500-kv EHV (extra-high-voltage) bundle conductor transmission line. Because of rigid specifications and new design features, new construction practices had to be developed in many areas, particularly foundation construction, tower erection, and the tension stringing of a 4-conductor bundle.
Keywords :
Cables; Conductors; Construction; Corona; Electromagnetic interference; Poles and towers; Power transmission lines; Propagation losses; Prototypes; Transmission lines;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1964.4765988