    25/41-MW Cyclic Steam Power Plant Serving Hot Strip Steel Finishing Mill

  • Author

    Fawcett, D.V.

  • Author_Institution
    Canadian Westinghouse Company Ltd., Hamilton, Ont., Canada.
  • Volume
    84
  • Issue
    4
  • fYear
    1965
  • fDate
    4/1/1965 12:00:00 AM
  • Firstpage
    327
  • Lastpage
    333
  • Abstract
    The 6-stand hot strip finishing mill planned by Algoma Steel would impose frequent swings on the utility tie line of 41 MW and 41 Mvar. Each swing would occur over a 10-second interval. To avoid these swings on the utility tie, a steam power plant rated 25 MW continuous with features permitting peak cyclic loading to 41 MW and 41 Mvar was installed. Special megawatt and megavar controls vary the power plant output to match the varying input to the strip mill. High-speed recordings of plant performance during strip mill operation are included. This is believed to be one of the few, if not the only, steam power plants operating in this manner.
  • Keywords
    Contracts; Cooling; DC motors; Finishing; Impedance matching; Milling machines; Power generation; Rectifiers; Steel; Strips;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1965.4766199
  • Filename
    4766199