DocumentCode
1112838
Title
25/41-MW Cyclic Steam Power Plant Serving Hot Strip Steel Finishing Mill
Author
Fawcett, D.V.
Author_Institution
Canadian Westinghouse Company Ltd., Hamilton, Ont., Canada.
Volume
84
Issue
4
fYear
1965
fDate
4/1/1965 12:00:00 AM
Firstpage
327
Lastpage
333
Abstract
The 6-stand hot strip finishing mill planned by Algoma Steel would impose frequent swings on the utility tie line of 41 MW and 41 Mvar. Each swing would occur over a 10-second interval. To avoid these swings on the utility tie, a steam power plant rated 25 MW continuous with features permitting peak cyclic loading to 41 MW and 41 Mvar was installed. Special megawatt and megavar controls vary the power plant output to match the varying input to the strip mill. High-speed recordings of plant performance during strip mill operation are included. This is believed to be one of the few, if not the only, steam power plants operating in this manner.
Keywords
Contracts; Cooling; DC motors; Finishing; Impedance matching; Milling machines; Power generation; Rectifiers; Steel; Strips;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1965.4766199
Filename
4766199
Link To Document