Second Interim Report-Minimum Electrical Clearances for Substations Based on Switching Surge Requirements
Author :
IEEE Committee Report
Volume :
84
Issue :
5
fYear :
1965
fDate :
5/1/1965 12:00:00 AM
Firstpage :
415
Lastpage :
417
Abstract :
The Working Group on Project 59.1 of the Transmission Substations Subcommittee of the IEEE Substations Committee is preparing a Guide for Minimum Electrical Clearances for Substations. This paper presents an interim report of tentative recommendations for clearances in substations rated 230 kV and higher, and based on switching surge considerations. Clearances for line-to-ground insulation systems have been based upon rod-to-plane switching surge test data. Phase-to-phase clearances have been based on rod-to-rod switching surge test data. Clearances are determined for a variety of switching surge levels and probabilities that the maximum transient voltage will be withstood.
Keywords :
Conductors; Dielectrics and electrical insulation; Impulse testing; Insulation testing; Printing; Shunt (electrical); Substations; Surges; System testing; Voltage control;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1965.4766214