• DocumentCode
    1119244
  • Title

    Semantics of Schedules for the Fuzzy Job-Shop Problem

  • Author

    González-Rodríguez, Inés ; Puente, Jorge ; Vela, Camino R. ; Varela, Ramiro

  • Author_Institution
    Univ. of Cantabria, Santander
  • Volume
    38
  • Issue
    3
  • fYear
    2008
  • fDate
    5/1/2008 12:00:00 AM
  • Firstpage
    655
  • Lastpage
    666
  • Abstract
    In the sequel, we consider the fuzzy job-shop problem, which is a variation of the job-shop problem where duration of tasks may be uncertain and where due-date constraints are allowed to be flexible. Uncertain durations are modeled using triangular fuzzy numbers, and due-date constraints are fuzzy sets with decreasing membership functions expressing a flexible threshold ldquoless than.rdquo Also, the objective function is built using fuzzy decision-making theory. We propose the use of a genetic algorithm (GA) to find solutions to this problem. Our aim is to provide a semantics for this type of problems and use this semantics in a methodology to analyze, evaluate, and, therefore, compare solutions. Finally, we present the results obtained using the GA and evaluate them using the proposed methodology.
  • Keywords
    decision making; decision theory; fuzzy set theory; genetic algorithms; job shop scheduling; due-date constraint; fuzzy decision-making theory; fuzzy job-shop scheduling problem; fuzzy set theory; genetic algorithm; schedule semantics; triangular fuzzy numbers; Fuzzy systems; genetic algorithms (GAs); scheduling;
  • fLanguage
    English
  • Journal_Title
    Systems, Man and Cybernetics, Part A: Systems and Humans, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1083-4427
  • Type

    jour

  • DOI
    10.1109/TSMCA.2008.918603
  • Filename
    4481218