DocumentCode
1128157
Title
Practical implementation of the SCADA+AGC/ED system of the Hunan power pool in the central China power network
Author
Xichang, Yu ; Quanren, Zhou
Author_Institution
Electr. Power Dispatch Control Center, Hunan Univ., Changsha, China
Volume
9
Issue
2
fYear
1994
fDate
6/1/1994 12:00:00 AM
Firstpage
250
Lastpage
255
Abstract
To accomplish the dispatching automation of the Hunan Power Pool (HPP), a supervisory control and data acquisition and automatic generation control/economic dispatch (SCADA+AGC/ED) system supplied by Systems Control in the USA was imported by the Hunan Power Dispatch Control Center. In December 1990 the practical implementation acceptance test for the new system was completed. The new system is the first system completed to use closed loop control of AGC in the power pools of China. This paper reviews the background of developing the new system, and describes implementation schemes and operation tests of AGC. At the same time, the Constant Net Interchange (CNI) mode of AGC in the HPP is also discussed in detail, and finally the economic benefits and the improved operation quality after AGC is in operation are described
Keywords
SCADA systems; closed loop systems; economics; load dispatching; power system computer control; power system interconnection; project engineering; China; SCADA; automatic generation control; closed loop control; constant net interchange mode; economic dispatch; power system automation; supervisory control and data acquisition; Automatic generation control; Centralized control; Control systems; Hydroelectric power generation; Intelligent networks; Power generation economics; Power markets; Power system economics; Stability; System testing;
fLanguage
English
Journal_Title
Energy Conversion, IEEE Transactions on
Publisher
ieee
ISSN
0885-8969
Type
jour
DOI
10.1109/60.300151
Filename
300151
Link To Document