DocumentCode
1133707
Title
Construction details and test results from RHIC sextupoles
Author
Lindner, M. ; Anerella, M. ; Ganetis, G. ; Garber, M. ; Ghosh, A. ; Greene, A. ; Gupta, R. ; Jain, A. ; Kahn, S. ; Kelly, E. ; Killian, E. ; Morgan, G. ; Prodell, A. ; Rehak, M. ; Robins, K. ; Sampson, W. ; Shutt, R. ; Thomas, R. ; Thompson, P. ; Wanderer
Author_Institution
RHIC Project, Brookhaven Nat. Lab., Upton, NY, USA
Volume
30
Issue
4
fYear
1994
fDate
7/1/1994 12:00:00 AM
Firstpage
1730
Lastpage
1733
Abstract
Four 8 cm aperture sextupoles have been built at BNL to verify the magnetic performance of this magnet in the RHIC installation. Two significantly different mechanical configurations have been designed, and two magnets of each design have been built, and successfully tested, and have exceeded the required minimum quench current by a substantial margin. This report describes the assembly details of the second configuration, which is the final production configuration. In addition the first industry built production sextupole has been delivered and tested. This report presents the results of quench tests on all 5 magnets and field measurements on the first production sextupole
Keywords
beam handling equipment; ion accelerators; storage rings; superconducting magnets; superconducting transition temperature; synchrotrons; RHIC sextupoles; magnetic performance; mechanical configurations; minimum quench current; quench tests; Apertures; Assembly; Boring; Cryogenics; Production; Saturation magnetization; Superconducting coils; Superconducting magnets; Testing; Wire;
fLanguage
English
Journal_Title
Magnetics, IEEE Transactions on
Publisher
ieee
ISSN
0018-9464
Type
jour
DOI
10.1109/20.305590
Filename
305590
Link To Document