• DocumentCode
    1145666
  • Title

    A survey of relay test practices 1991 results. IEEE power system relaying committee report

  • Author

    McElray, J.L. ; Warwick, B.K. ; Baumgartner, E.A. ; Burzese, A.A. ; Daume, J.F. ; Feldman, B.J. ; Fennell, E.C. ; Fromen, C.W. ; Hawver, D.W. ; Hemming, D.R. ; Huddleston, J.D., III ; Ingleson, J.W. ; Jodice, J.A. ; Lerley, P.J. ; Marsh, W.J., Jr. ; Ranki

  • Volume
    9
  • Issue
    3
  • fYear
    1994
  • fDate
    7/1/1994 12:00:00 AM
  • Firstpage
    1339
  • Lastpage
    1351
  • Abstract
    The results of a survey of North American Relay Engineers concerning their practices for testing protective and other relays and their personnel requirements are presented. Relay tolerances, training requirements, relay test schedules, relay test intervals, and relay test equipment are discussed
  • Keywords
    personnel; power system protection; relay protection; training; IEEE power system relaying committee; North American Relay Engineers; personnel requirements; power generation protection; protective relays testing; relay test equipment; relay test intervals; relay test practices; relay test schedules; relay tolerances; training requirements;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.311161
  • Filename
    311161