• DocumentCode
    1146758
  • Title

    A Fast Response Impulse Voltage Measuring System for Testing of Gas Insulated Substations Equipment

  • Author

    Shihab, S.

  • Author_Institution
    Department of Electrical Engineering Eindhoven University of Technology, Eindhoven, The Netherlands
  • Volume
    1
  • Issue
    3
  • fYear
    1986
  • fDate
    7/1/1986 12:00:00 AM
  • Firstpage
    42
  • Lastpage
    47
  • Abstract
    The step response characteristics of a single-capacitor, differentiating-integrating (DI) measuring system are outlined. This system has an intrinsic response time less than 1 ns. The factors influencing this very fast response when the system is incorporated in a large size GIS component are discussed. Further results demonstrate the application of the system for measurements on a GIS component with steep front-chopped impulse voltage with a rate of rise up to 2 kV/ns. The very fast response and the simplicity of this system offer a powerful measuring technique for impulse testing and fast transient measurements in GIS systems.
  • Keywords
    Capacitance measurement; Circuit testing; Dielectrics and electrical insulation; Gas insulation; Geographic Information Systems; Impulse testing; Inductance measurement; Substations; System testing; Voltage measurement;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/TPWRD.1986.4307973
  • Filename
    4307973