• DocumentCode
    1147336
  • Title

    Planning and Protection Implications of Reduced Fault-Withstand Time of Power Transformers

  • Author

    Brown, Roland W. ; Khan, Shoaib

  • Author_Institution
    SNC Inc., Montreal, Quebec, Canada
  • Volume
    1
  • Issue
    4
  • fYear
    1986
  • Firstpage
    60
  • Lastpage
    67
  • Abstract
    The recent revisions (1980-1983) to the standards for power transformers in both the U.S.A. and Canada call for corresponding revisions in many related planning and protection practices. Particularly, it is found that the reduction to 2 seconds for maximum through faults on transformers and the necessity to include a value for system impedance in the specification of the larger transformers will have significant effects on previous practices for planning, protection, operations, loading and specification. This paper discusses a number of these effects, with an emphasis from a protection point of view.
  • Keywords
    ANSI standards; Impedance; Meeting planning; Power system planning; Power system protection; Power transformers; Proposals; Standards publication; Temperature; Transformers, Regulators and Reactors - c57;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/TPWRD.1986.4308030
  • Filename
    4308030