Round-Robin Testing of Three Phase Padmount Transformers
Author :
Faris, Donald E., Jr. ; Hilsenbeck, L.L. ; Ronan, Edward R., Jr.
Author_Institution :
Cincinnati Gas & Electric Co. Cincinnati, OH
Volume :
2
Issue :
2
fYear :
1987
fDate :
4/1/1987 12:00:00 AM
Firstpage :
414
Lastpage :
419
Abstract :
This paper addresses the accuracy of 3-phase transformer loss testing with particular attention to the reliability of manufacturers´ certified loss test results. Seven three-phase padmounts, one from each of seven different manufacturers, were used in a round-robin test program. In addition to their original production tests, each of the seven manufacturers performed loss tests on the entire group of transformers. The results of the program indicate an uncomfortably wide range of results.
Keywords :
Cities and towns; Costs; Feedback; Life estimation; Performance evaluation; Production; Pulp manufacturing; Test facilities; Testing; Transformers;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/TPWRD.1987.4308124
Filename :
4308124
Link To Document :
بازگشت