• DocumentCode
    1149493
  • Title

    Analysis and Operating Experience for Back-to-Back 115 KV Capacitor Banks

  • Author

    Spurling, K.L. ; Poitras, A.E. ; McGranaghan, M.F. ; Shaw, J.H.

  • Author_Institution
    Central Maine Power Company
  • Volume
    2
  • Issue
    4
  • fYear
    1987
  • Firstpage
    1255
  • Lastpage
    1263
  • Abstract
    This paper describes design studies, protective relaying, operating experience, and an automatic control system for a 115kV capacitor installation involving back-to-back capacitors. The design studies evaluated switching concerns and equipment requirements for the installation. The paper details concerns which are unique to back-to-back capacitor installations. The automatic control system is designed to implement switching strategies based on power flow levels, system voltage, and equipment protection. The operating experience includes switch restrikes which are suspected to have caused equipment failures. These restrike transients are analyzed and solutions to the problem described.
  • Keywords
    Automatic control; Capacitors; Control systems; Frequency; Performance analysis; Protective relaying; Size control; Surge protection; Transient analysis; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/TPWRD.1987.4308249
  • Filename
    4308249