Title : 
System Capacity Required for 3-Phase Arc Furnaces [includes discussion]
         
        
            Author : 
Ramsaur, Oliver ; Treweek, J.E.
         
        
            Author_Institution : 
MEMBER AIEE, Pennsylvania Power & Light Company, Allentown, Pa.
         
        
        
        
        
            Keywords : 
Capacitance; Frequency; Furnaces; Fuses; Laboratories; Magnetic recording; Oscilloscopes; Substations; Testing; Voltage fluctuations;
         
        
        
            Journal_Title : 
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
         
        
        
        
        
            DOI : 
10.1109/AIEEPAS.1954.4498974