• DocumentCode
    1151231
  • Title

    Operation at Low Frequency in Great Britain [includes discussion]

  • Author

    Squire, P.J.

  • Author_Institution
    NONMEMBER AIEE, British Electricity Authority, London, England.
  • Volume
    73
  • Issue
    2
  • fYear
    1954
  • Abstract
    Since World War II serious plant shortage in Britain has necessitated load shedding during the winter peak periods. Load reductions were effected by reducing frequency and voltage and on occasions by disconnecting some supplies. This report summarizes the experience of operation at low frequency in Britain and indicates its effect on demand.
  • Keywords
    Electric breakdown; Frequency estimation; Low voltage; Manufacturing; Power engineering and energy; Power generation; Production; Space heating; Systems engineering and theory; Transmission lines;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
  • Publisher
    ieee
  • ISSN
    0097-2460
  • Type

    jour

  • DOI
    10.1109/AIEEPAS.1954.4499014
  • Filename
    4499014