DocumentCode
1151231
Title
Operation at Low Frequency in Great Britain [includes discussion]
Author
Squire, P.J.
Author_Institution
NONMEMBER AIEE, British Electricity Authority, London, England.
Volume
73
Issue
2
fYear
1954
Abstract
Since World War II serious plant shortage in Britain has necessitated load shedding during the winter peak periods. Load reductions were effected by reducing frequency and voltage and on occasions by disconnecting some supplies. This report summarizes the experience of operation at low frequency in Britain and indicates its effect on demand.
Keywords
Electric breakdown; Frequency estimation; Low voltage; Manufacturing; Power engineering and energy; Power generation; Production; Space heating; Systems engineering and theory; Transmission lines;
fLanguage
English
Journal_Title
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher
ieee
ISSN
0097-2460
Type
jour
DOI
10.1109/AIEEPAS.1954.4499014
Filename
4499014
Link To Document