DocumentCode :
1151952
Title :
Batch process automation - APPLYING THE PRINCIPLES OF BATCH AUTOMATION AND SELECTING A SUITABLE CONTROL SYSTEM AND SUPPLIER IS ONLY PART OF THE STORY. MANAGING A BATCH AUTOMATION PROJECT REQUIRES CONSIDERATIONS OVER AND ABOVE THOSE NEEDED FOR THE AUTOMATI
Author :
James, David
Author_Institution :
Invensys Process Syst.
Volume :
85
Issue :
6
fYear :
2006
Firstpage :
36
Lastpage :
41
Abstract :
Batch processes, by their very nature, are rarely in a steady state for any great length of time. This constant change of plant and process state results in a level of complexity of the automation of the process that is not found in continuous processes such as refining. However, even with a sound understanding of the principles of batch automation, with a chosen control system and batch management software, and with a supplier with whom you believe you can work, there is still the need to manage the project development process. By performing a structured analysis based on the ISA 88.01 models and using the power of modern day control systems and batch management packages, a flexible production system can be produced on time and to budget
Keywords :
batch processing (industrial); control engineering computing; flexible manufacturing systems; production control; production engineering computing; project management; ISA 88.01 models; batch management software; batch process automation; control system; flexible production system; project development process management; refining; structured analysis;
fLanguage :
English
Journal_Title :
Manufacturing Engineer
Publisher :
iet
ISSN :
0956-9944
Type :
jour
Filename :
4104827
Link To Document :
بازگشت