    Scheduling of Parallel Computation for a Computer-Controlled Mechanical Manipulator

  • Author

    Luh, J.Y.S. ; Lin, C.S.

  • Volume
    12
  • Issue
    2
  • fYear
    1982
  • fDate
    3/1/1982 12:00:00 AM
  • Firstpage
    214
  • Lastpage
    234
  • Abstract
    The physical compactness of the microcomputer has made it feasible to mount the controller and the mechanical manipulator together as a single unit. By using a computer with multiple central processing units (CPU\´s), parallel computations may be executed to achieve a minimum computing time so that a real-time control is possible. The parallel processing system utilizes one CPU for each link of the manipulator. Because of the dynamic coupling between adjacent links, precedence relations appear among the subtasks to be executed in CPU\´s. Under the series-parallel precedence constraints a method of "variable" branch-and-bound has been developed which determines an optimum ordered schedule for each of the CPU\´s. It consists of, alternatively, forward and backward search procedures with an aid of pushdown-stacks. In each forward search procedure, it seeks the currently feasible schedule with shorter computing time which updates the upper bound of the optimum schedule, while in each backward search procedure it discards those schedule-branches that will not provide improvements. A Fortran program has been written for a manipulator based on the Newton-Euler formulation of dynamic equations and is applied to the Stanford manipulator as an illustration.
  • Keywords
    Central Processing Unit; Centralized control; Concurrent computing; Equations; Manipulator dynamics; Mechanical variables control; Microcomputers; Parallel processing; Processor scheduling; Upper bound;
  • fLanguage
    English
  • Journal_Title
    Systems, Man and Cybernetics, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9472
  • Type

    jour

  • DOI
    10.1109/TSMC.1982.4308805
  • Filename
    4308805