DocumentCode
1156053
Title
Electrical studies for an industrial gas turbine cogeneration facility
Author
Doughty, Richard L. ; Gise, Louis ; Kalkstein, Edward W. ; Willoughby, Ronald D.
Author_Institution
E.I. du Pont Co., Newark, DE, USA
Volume
25
Issue
4
fYear
1989
Firstpage
750
Lastpage
765
Abstract
Electrical studies are required to assure the proper integration of a gas-turbine cogeneration facility into an existing industrial-plant electrical system and the connected utility grid. Details of such a study are presented, including boundary-limit definition for the system model, individual component modeling, load-flow and short-circuit studies, stability studies, and simulation of online isolation from the electric utility during system undervoltage or underfrequency conditions. The impact of such studies on the design process and plant system reliability is discussed
Keywords
cogeneration; gas turbines; load flow; reliability; short-circuit currents; stability; boundary-limit definition; component modeling; electrical system; industrial gas turbine cogeneration facility; load-flow; online isolation; plant system reliability; short-circuit; simulation; stability; underfrequency; undervoltage; utility grid; Cogeneration; Gas industry; Power engineering and energy; Power generation; Power industry; Power systems; Reactive power; Synchronous motors; Turbines; Voltage;
fLanguage
English
Journal_Title
Industry Applications, IEEE Transactions on
Publisher
ieee
ISSN
0093-9994
Type
jour
DOI
10.1109/28.31258
Filename
31258
Link To Document