• DocumentCode
    1158533
  • Title

    Installation and Start up of an On-Line State Estimator

  • Author

    Ollinda, P. Van ; Wrubel, J.N., Sr. ; Wollenberg, B.F., Sr. ; Woodzell, G.W.

  • Author_Institution
    Public Service Electric & Gas Co.
  • Issue
    11
  • fYear
    1981
  • Firstpage
    4591
  • Lastpage
    4596
  • Abstract
    This paper presents some of the practical aspects of installing a state estimator in a utility energy control center. The telemetry system had been installed for a number of years prior to the Incorporation of the state estimation function. Most of the installation problems involve measurement observability which is given greatest attention in the paper. Additional useful techniques are described which were used to overcome algorithm convergence problems and to enhance the ability of the estimator to detect and identify bad measurements.
  • Keywords
    Convergence; Data security; Fluid flow measurement; Gain measurement; Monitoring; Observability; Q measurement; State estimation; Strontium; Telemetry;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1981.316799
  • Filename
    4110548