DocumentCode :
1158934
Title :
Genetration Planning Model with Reliability Constraints
Author :
Anders, G.J.
Author_Institution :
Ontario Hydro
Issue :
12
fYear :
1981
Firstpage :
4901
Lastpage :
4908
Abstract :
The generation expansion models described in the literature are, in a majority of cases, formulated as deterministic optimization problems. The reliability criteria, if present, are represented as deterministic constraints on the reserve margin or, in some cases, as a loss of load probability (LOLP) criterion. In this paper, two probabilistic reliability criteria are represented. In addition to the LOLP criterion, the probabilistic constraints on real power flows in the transmission lines are introduced. The solution procedures for the resulting chance constrained stochastic programming problems are also discussed. The basic concepts developed in this paper are applied to a small system to demonstrate the influence of power flow constraints on the selection process.
Keywords :
Capacity planning; Cost function; Desktop publishing; Investments; Load flow; Mathematical model; Power generation; Power system reliability; Random variables; Thermal loading;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1981.316454
Filename :
4110597
Link To Document :
بازگشت