• DocumentCode
    1160929
  • Title

    Optimal Hydrothermal Scheduling with Cascaded Plants Using Progressive Optimality Algorithm

  • Author

    Nanda, J. ; Bijwe, P.R.

  • Author_Institution
    Department of Electrical Engineering Indian Institute of Technology
  • Issue
    4
  • fYear
    1981
  • fDate
    4/1/1981 12:00:00 AM
  • Firstpage
    2093
  • Lastpage
    2099
  • Abstract
    This paper presents an application of the ´Progressive Optimality Algorithm´ (POA) to the problem of short range optimal hydrothermal scheduling in a power system consisting of ca. caded plants with time delay. Head variation and constraints imposed due to equipment ratings and operating conditions on hydro as well as thermal-electric subsystems have been considered. Electrical subsystem has been represented in detail through ac power flows. Resulbs for a sample 5 bus system consisting of two hydro (cascaded) and two thermal stations clearly reveal the simplicity, effectiveness and distinct superiority of the progressive optamility algorithm over many of the existing techniques. The algorithm requires minimal storage and is extremely fast. It is envisaged thst POA technique would greatly appeal to the utility engineers for practical application.
  • Keywords
    Costs; Hydroelectric-thermal power generation; Load flow; Power generation; Reactive power; Reservoirs; Scheduling algorithm; Thermal factors; Thermal loading; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1981.316486
  • Filename
    4110834