Title : 
A Simplified Procedure for Determining the Auxiliary Bus Voltage and Angle During Bus Transfer
         
        
        
            Author_Institution : 
Bechtel Power Corp.
         
        
        
        
            fDate : 
6/1/1981 12:00:00 AM
         
        
        
        
            Abstract : 
During a power station auxiliary bus transfer the bus residual voltage and angle relative to the reserve bus voltage are critical for the first .5 second. A procedure is presented that determines the auxiliary bus voltage during the critical period of the bus transfer. For this simplified procedure a gas fired steam turbine generator auxiliary system is the test case used. The procedure is equally applicable to a nuclear steam turbine generator auxiliary system. The effect of residual motor current is reviewed. Motor speed may also be determined with reasonable accuracy.
         
        
            Keywords : 
Equations; Load flow; Medium voltage; Nuclear power generation; Power generation; Power system modeling; Steady-state; Synchronous motors; System testing; Turbines;
         
        
        
            Journal_Title : 
Power Apparatus and Systems, IEEE Transactions on
         
        
        
        
        
            DOI : 
10.1109/TPAS.1981.316373