DocumentCode :
1163157
Title :
Progress Report on a Guide for Loading Oil-Immersed Power Transformers Rated in Excess of 100 MVA
Author :
Committee, I.T.
Issue :
8
fYear :
1981
Firstpage :
4020
Lastpage :
4032
Abstract :
The development of a loading guide for large power transformers was considered by the IEEE Transformers Committee on the basis of special problems inherent in large transformers. This paper addresses some of these special problems, such as risk, types of loading, temperature limitations, and user specification, and it discusses the reasons behind features found in the proposed guide. The basis for many of the changes that have been developed here are related to the results of recent research projects and the extensive computer facilities now available to users.
Keywords :
Cooling; Dielectrics and electrical insulation; Insulation life; Manufacturing; Mechanical factors; Power transformer insulation; Power transformers; Temperature; Thermal factors; Thermal stresses;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1981.316997
Filename :
4111093
Link To Document :
بازگشت