Title :
Lessons learned
Author :
Trenholm, Barry
Author_Institution :
Petro-Canada, St. John´´s, Nfld.
Volume :
12
Issue :
5
fYear :
2006
Firstpage :
22
Lastpage :
27
Abstract :
This article examines the lessons learned in development and operation of the first disconnectable floating production storage and offloading (FPSO) offshore oil platform to be built for the North Atlantic. To assist in organizing the lessons learned into a framework that applies to other projects, this article investigates the following stages of the project: specification, design, construction, commissioning, operation, and maintenance
Keywords :
commissioning; design engineering; maintenance engineering; offshore installations; North Atlantic; commissioning; disconnectable floating production storage-offloading; learning; maintenance; offshore oil platform design; Costs; Drives; Industrial plants; Knowledge engineering; Manufacturing; Packaging; Petroleum; Power generation; Procurement; Production facilities;
fLanguage :
English
Journal_Title :
Industry Applications Magazine, IEEE
Publisher :
ieee
ISSN :
1077-2618
Type :
jour
DOI :
10.1109/MIA.2006.1678383
Filename :
1678383
Link To Document :
بازگشت