DocumentCode :
116361
Title :
Integrated planning and scheduling by hybrid solution method
Author :
Yunfei Chu ; Fengqi You
Author_Institution :
Dept. of Chem. & Biol. Eng., Northwestern Univ., Evanston, IL, USA
fYear :
2014
fDate :
15-17 Dec. 2014
Firstpage :
6818
Lastpage :
6823
Abstract :
We propose a novel method for integrating planning and scheduling problems under production uncertainties. The integrated problem is formulated into a bi-level program where the planning problem is solved in the upper level and the scheduling problems in the planning periods are solved under uncertainties in the lower level. The planning and scheduling problems are linked via service level constraints. To solve the integrated problem, a hybrid method is developed, which iterates between a mixed-integer linear programming solver for the planning problem and an agent-based reactive scheduling method. If the service level constraints are not met, a cutting plane constraint is generated by the agent-based scheduling method and appended to the planning problem which is solved to determine new production quantities. The proposed method is demonstrated by a complicated problem.
Keywords :
integer programming; linear programming; production planning; scheduling; agent-based reactive scheduling method; bi-level program; cutting plane constraint; hybrid solution method; integrated problem; mixed-integer linear programming solver; planning problems; production uncertainties; scheduling problems; service level constraints; Computational modeling; Job shop scheduling; Planning; Uncertainty; Vectors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Decision and Control (CDC), 2014 IEEE 53rd Annual Conference on
Conference_Location :
Los Angeles, CA
Print_ISBN :
978-1-4799-7746-8
Type :
conf
DOI :
10.1109/CDC.2014.7040460
Filename :
7040460
Link To Document :
بازگشت