DocumentCode :
1164558
Title :
Integrated Resource Allocation and Scheduling in a Bidirectional Flowshop With Multimachine and COS Constraints
Author :
Zhao, Zhengyi John ; LAU, Hoong Chuin ; Ge, Shuzhi Sam
Author_Institution :
Sch. of Inf. Syst., Singapore Manage. Univ., Singapore
Volume :
39
Issue :
2
fYear :
2009
fDate :
3/1/2009 12:00:00 AM
Firstpage :
190
Lastpage :
200
Abstract :
An integer programming (IP) model is proposed for integrated resource allocation and operation scheduling for a multiple job-agents system. Each agent handles a specific job-list in a bidirectional flowshop. For the individual agent scheduling problem, a formulation is proposed in continuous time domain and compared with an IP formulation in discrete time domain. Of particular interest is the formulation of the machine utilization function-both in continuous time and discrete time. Fast heuristic methods are proposed with the relaxation of the machine capacity. For the integrated resource allocation and scheduling problem, a linear programming relaxation approach is applied to solve the global resource allocation and a fast heuristic method is applied to solve each scheduling subproblem. The proposed solution is compared experimentally with that from the integer programming solver by CPLEX.
Keywords :
flow shop scheduling; integer programming; linear programming; multi-agent systems; resource allocation; COS constraints; CPLEX; bidirectional flowshop schedule; critical operation sequence; individual agent scheduling problem; integer programming; integrated resource allocation; linear programming relaxation; multiple job-agents system; operation schedule; Flowshop scheduling; multiple machine; resource allocation;
fLanguage :
English
Journal_Title :
Systems, Man, and Cybernetics, Part C: Applications and Reviews, IEEE Transactions on
Publisher :
ieee
ISSN :
1094-6977
Type :
jour
DOI :
10.1109/TSMCC.2008.2007500
Filename :
4785225
Link To Document :
بازگشت