• DocumentCode
    1164904
  • Title

    Electrical Control Features of the Bonneville Hydroelectric Project

  • Author

    Brockschink, S.R.

  • Author_Institution
    US ARMY CORPS OF ENGINEERS HYDROELECTRIC DESIGN BRANCH
  • Issue
    12
  • fYear
    1982
  • Firstpage
    4617
  • Lastpage
    4624
  • Abstract
    With the addition of the second hydroelectric powerhouse at the Bonneville project a method of control of the second powerhouse needed to be designed. The development of this control will be explained by general discussion. A review of the method of integrating the second powerhouse control with the first powerhouse control will present a unique approach taken to the problem. The material presented should provide useful information to anyone confronted with a similar problem.
  • Keywords
    Automatic control; Centralized control; Control systems; Cranes; Ducts; Human factors; Marine animals; Rivers; Size control; Underground power cables;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1982.317318
  • Filename
    4111300