Title :
Staged Fault Tests with Single Phase Reclosing on the Winnipeg-Twin Cities 500kV Interconnection
Author :
Kappenman, J.G. ; Sweezy, G.A. ; Koschik, V. ; Mustaphi, K.K.
Author_Institution :
Minnesota Power
Issue :
3
fYear :
1982
fDate :
3/1/1982 12:00:00 AM
Firstpage :
662
Lastpage :
673
Abstract :
Staged line-to-ground fault tests were performed on the longest section of single-phase switched line in the world, the 528 km Dorsey-Forbes 500 kV line. Fault location and line loading conditions were varied for the nine fault tests applied and measurements were made of the primary and secondary arc currents and the arc recovery voltage. Arc extinction occurred rapidly with no restrikes during all of the tests. Secondary arc extinction occurred less than 50 ms after the beginning of the open phase deadtime. The rennants of the direct current offset in the fault current had a significant effect in delaying the secondary arc extinction.
Keywords :
Cities and towns; Current measurement; Fault location; Frequency; Inductors; Performance evaluation; Shunt (electrical); Substations; Testing; Voltage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1982.317281
Filename :
4111376
Link To Document :
بازگشت