Abstract
The current practice of placing large-size fossil and nuclear steam-generating units into commercial operation will continue unabated for at least the next 10 years. Such units, intended primarily for base-load operation, generally do not have large load-turndown and two-shift cycling capabilities. Consequently, a loss of operating flexibility is slowly being created with potential future problems for power system operation.
Keywords
Councils; Fuels; Industrial power systems; Meeting planning; Nuclear power generation; Power generation; Power system planning; Power system reliability; Scheduling; US Department of Energy;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1982.317188
Filename
4111475
Link To Document