  • Abstract
    The current practice of placing large-size fossil and nuclear steam-generating units into commercial operation will continue unabated for at least the next 10 years. Such units, intended primarily for base-load operation, generally do not have large load-turndown and two-shift cycling capabilities. Consequently, a loss of operating flexibility is slowly being created with potential future problems for power system operation.
  • Keywords
    Councils; Fuels; Industrial power systems; Meeting planning; Nuclear power generation; Power generation; Power system planning; Power system reliability; Scheduling; US Department of Energy;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1982.317188
  • Filename
    4111475