DocumentCode
1166461
Title
A framework for the specification of SCADA data links
Author
Bruce, A.G. ; Lee, R.
Author_Institution
Worley Consultants Ltd.
Volume
9
Issue
1
fYear
1994
fDate
2/1/1994 12:00:00 AM
Firstpage
560
Lastpage
564
Abstract
SCADA system overall performance is dependent on satisfactory performance of the integral data communication links. Therefore a specification of the required data link performance is required as part of the system specification. But what should the data link specification include? The specification of data rate alone is shown to be insufficient to guarantee performance under all operating conditions. To determine the additional attributes that must be specified, the sensitivity of SCADA performance to the set of data link attributes is analysed by computer simulation. From the results of the simulation a subset of significant data link attributes is identified. This is the desired data link specification framework
Keywords
SCADA systems; data communication systems; digital simulation; power station computer control; SCADA data links; bit error rate limits; computer simulation; data link specification; integral data communication links; power system disturbances; sensitivity analysis; Bit error rate; Circuit breakers; Computer simulation; Data analysis; Data communication; Databases; Delay; Performance analysis; Protocols; SCADA systems;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.317565