DocumentCode :
1168555
Title :
Electrical Features of the Bath County Pumped - Storage Project
Author :
Fostiak, R.J. ; Thompson, W.L.
Author_Institution :
Harza Engineering Co.
Issue :
9
fYear :
1982
Firstpage :
3166
Lastpage :
3172
Abstract :
The Bath County Pumped Storage Project is scheduled for full commercial operation on the VEPCO system in October, 1986. This paper describes the significant features of the major electrical equipment. Particular emphasis is placed on the considerations which led to the selection of static, variable-frequency starting of the units as pumps and to the use of a gas-insulated (GIS) 500-kV switchyard.
Keywords :
Circuit breakers; Earth; Electrical capacitance tomography; Power engineering and energy; Power generation; Reactive power; Reservoirs; Switches; Tellurium; Water resources;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1982.317530
Filename :
4111721
Link To Document :
بازگشت