Electrical - Mechanical Design of the Bonneville Second Powerhouse
Author
McDonald, D.T. ; Meloy, G.R. ; Nelson, R.E. ; Loney, S.R.
Author_Institution
US ARMY CORPS OF ENGINEERS HYDROELECTRIC DESIGN BRANCH
Issue
9
fYear
1982
Firstpage
3585
Lastpage
3591
Abstract
Development of upstream storage in the existing Columbia River basin made it economically attractive to add a second powerhouse to the existing Bonneville Project. The design problem concerned integrating the new powerhouse into a 40 year old project while meeting environmental constraints in river flow and providing for anadromous fish passage. Scope of treatment involves a general discussion of project ectrical and mechanical features with a review of equipment selected and reasons for selection in Certain cases. The resulting discussion provides information on the design of a large low head hydroelectric powerhouse which began commerical operation in 1981
Keywords
Centralized control; Design engineering; IEEE members; Navigation; Power engineering and energy; Power generation; Power generation economics; Power system economics; Rivers; Strontium;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1982.317566
Filename
4111775
Link To Document