DocumentCode :
1171328
Title :
Load Forecasting on the TVA System Par I-Substation Loads
Author :
New, W.R.
Volume :
81
Issue :
3
fYear :
1962
fDate :
4/1/1962 12:00:00 AM
Firstpage :
101
Lastpage :
105
Abstract :
Efficient planning and design of the transmission system depends upon reasonably accurate forecastss of the loads it will serve. Substation load forecasts are prepared by the Tennessee Valley Authority (TVA) 15 years in advance. For the first 5 years, preliminary forecasts are prepared by months using time series analysis, carefully collected information, and judgment. Loads for another 10 years are extended largely on the basis of judgment. These preliminary forecasts are subjected to three critical reviews resulting in necessary modifications. The sum of adjacent substation loads is compared with larger area forecasts.
Keywords :
Business; Cultural differences; Economic forecasting; Load forecasting; Marketing and sales; Power generation economics; Power system economics; Power system planning; Substations; Weather forecasting;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher :
ieee
ISSN :
0097-2460
Type :
jour
DOI :
10.1109/AIEEPAS.1962.4501275
Filename :
4501275
Link To Document :
بازگشت