DocumentCode :
1171437
Title :
Modern Control of Large Hydroelectric Generating Stations
Author :
Bruck, R.H.
Volume :
81
Issue :
3
fYear :
1962
fDate :
4/1/1962 12:00:00 AM
Firstpage :
146
Lastpage :
152
Abstract :
A brief description is given of the evolution of control of large hydroelectric stations up to the present time, and also plans for control of future plants, including the John Day and Lowver Monumental plants now under construction. The design for new stations provides the same control in the powerhouse control room that would be provided at a remotecontrol station, and also is compatible, with a minimum of modification, with remote control from a central computer.
Keywords :
Hydroelectric power generation; Integrated circuit interconnections; Intelligent networks; Laboratories; Performance analysis; Phase measurement; Power system interconnection; Power transmission lines; Transformers; Transient analysis;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher :
ieee
ISSN :
0097-2460
Type :
jour
DOI :
10.1109/AIEEPAS.1962.4501287
Filename :
4501287
Link To Document :
بازگشت