DocumentCode
1171444
Title
Gas Pressure Calculations for Sealed Transformers Under Varying Load Conditions
Author
Oomnen, T.V.
Author_Institution
Westinghouse Electric Corporation Large Power Transformer Division
Issue
5
fYear
1983
fDate
5/1/1983 12:00:00 AM
Firstpage
1278
Lastpage
1284
Abstract
Pressure changes in the gas space of sealed transformers are discussed, and the necessary formulas to compute the equilibrium pressure corresponding to a given load condition are derived. It is shown that when gas solubility effects are included, the equilibrium pressure computed is appreciably different from the pressure computed otherwise. Computation of gas space pressure from gas-in-oil analysis data is also discussed.
Keywords
Contracts; Data analysis; Extraterrestrial measurements; Nitrogen; Petroleum; Power transformers; Pressure measurement; Protection; Temperature; Valves;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1983.318074
Filename
4112064
Link To Document