DocumentCode
1171791
Title
Electrical Features of Ontario Hydro´s Modern Supervisory-Controlled Hydraulic Generating Stations
Author
Ellis, J.W.
Volume
81
Issue
3
fYear
1962
fDate
4/1/1962 12:00:00 AM
Firstpage
331
Lastpage
339
Abstract
Since 1956, all Onttario Hydro´s hydraulic generating stations, developed in remote or semiremote areas, have been designed for supervisory control from existing stations. The electrical features of these plants are described, with emphasis on automatic control equipment, supervisory equipment, the extent to which remote control, telemetering, and annunciation is installed, the operation of units with depressed settings as synichronous condensers, station groundinig utilizing reinforcing steel, and how to obtain reliable service power without the use of smallcapacity service generators or separate service supplies from an outside source.
Keywords
Arresters; Flashover; Insulators; Lightning; Poles and towers; Power transformer insulation; Surface resistance; Surges; Testing; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, Part III. Transactions of the American Institute of Electrical Engineers
Publisher
ieee
ISSN
0097-2460
Type
jour
DOI
10.1109/AIEEPAS.1962.4501327
Filename
4501327
Link To Document